Is there a 12’W x 16’L x 10” or larger concrete pad or a level and compacted area of the same size to set a steel base pad? (Note: the 12’ side of the pad or compacted area should be closest to the building).

Is a 480V 100 amp service installed to disconnect within adjacent where elevator is to be set?

Is there enough area for a crane to unload equipment within proximately of where elevator is to be set.

Is there enough area to pull up a semi-trailer loaded with our equipment and an area equal to the space of two more semi-trailers to set equipment down. Is there still enough room for a crane to get the job done?

Is there any construction equipment, construction materials, dirt piles that contractor is required to be moved before delivery? If so, what are they?