|
Metro Elevator hoists will typically require a crane to erect and dismantle
our hoists. If you prefer a turnkey approach, Metro elevator can
package in the crane rental costs and take care of scheduling and logistics.
Not all cranes are the same, so you are safe if you let Metro take care of
reserving the right crane for the job. In situations where using a
crane is not possible, Metro can erect the elevator with a gin pole. The gin
pole serves as a boom for raising
and lowering the assembled tower using the car as the erection means. |