Image
image
image
image
 

Steel Base Pad


Installed and Removed by Metro

Metro’s Elevator Constructors can eliminate the need of pouring a concrete pad to support the weight of our hoists. As you can see, the steel pad needs only a 12’ x 16’ level and compacted area. When the job is completed, the pad is removed and there is no concrete removal or disposal necessary.


16' x 12' steel base pad


Steel base pad with hoist installation

 
image

Contact us | View site map